Live144 to decide0 of 144 decided, 144 to go. 66 of those run out before their supplier could deliver, so they are at the top. £156,207 of buying is proposed and 54 lines can be covered by moving stock the group already owns.
- 8383 lines have been waiting a week or moreThe oldest has sat here 15 days. Nothing on a queue announces itself, so the platform counts the days and puts them in front of you.Show these
- 1515 lines have no lead time on their supplier recordFourteen days is assumed on those lines and the confidence is marked down to say so. The assumption is on the line, never hidden inside the figure.Show these
- 2222 lines sit under their supplier minimum on their ownEach one is combined onto that supplier's draft order rather than shipped alone, so the minimum is met and carriage is not paid twice.Show these
- 2222 lines carry a one-off monthA mobilisation or a contract pause is excluded from the forecast rather than left to inflate the next order. The exclusion is stated on the line so a buyer can disagree with it.Show these

MSC East — Brentwood holds 96 free, which is 12 days of cover against a forecast of 8.0 a day. Northwood Hygiene Products needs 12 days and class A carries 7 days of safety stock, so the target position is 152 units. Neither depot has spare cover, so buy 60 from Northwood Hygiene Products.
Do nothing and MSC East — Brentwood runs out on 08/09/2026, which is 12 days. Northwood Hygiene Products needs 12 days to deliver. That is about £5,216 of sales at risk on this line alone.

MSC East — Brentwood holds 152 free, which is 17 days of cover against a forecast of 9.2 a day. Robert Scott needs 10 days and class A carries 7 days of safety stock, so the target position is 157 units. MSC West — Feltham can release 59 without going short, so move 5 on tomorrow's trunk run and buy nothing.
Do nothing and MSC East — Brentwood runs out on 12/09/2026, which is 17 days. Robert Scott needs 10 days to deliver. That is about £4,902 of sales at risk on this line alone.
Transfer first: MSC West — Feltham can release 59 without dropping below its own cover. Moving 5 arrives next day on the trunk run for £13.54 of handling, holds back £147 of spend and avoids 1.9 kg CO2e.

MSC West — Feltham holds 188 free with 13 already inbound, which is 18 days of cover against a forecast of 11.4 a day. Mirius needs 16 days and class A carries 7 days of safety stock, so the target position is 263 units. Neither depot has spare cover, so buy 70 from Mirius.
Do nothing and MSC West — Feltham runs out on 12/09/2026, which is 16 days. Mirius needs 16 days to deliver. That is about £4,646 of sales at risk on this line alone.

MSC East — Brentwood holds 180 free, which is 18 days of cover against a forecast of 9.8 a day. Evans Vanodine needs 14 days on the assumed lead time, none is on record and class A carries 7 days of safety stock, so the target position is 206 units. MSC West — Feltham can release 49 without going short, so move 26 on tomorrow's trunk run and buy nothing.
Do nothing and MSC East — Brentwood runs out on 14/09/2026, which is 18 days. Evans Vanodine needs 14 days to deliver. That is about £2,787 of sales at risk on this line alone.
Transfer first: MSC West — Feltham can release 49 without dropping below its own cover. Moving 26 arrives next day on the trunk run for £42.80 of handling, holds back £339 of spend and avoids 14.3 kg CO2e.

MSC East — Brentwood holds 60 free, which is 7 days of cover against a forecast of 8.4 a day. Bio Hygiene needs 3 days and class A carries 7 days of safety stock, so the target position is 84 units. Neither depot has spare cover, so buy 30 from Bio Hygiene.
Do nothing and MSC East — Brentwood runs out on 03/09/2026, which is 7 days. Bio Hygiene needs 3 days to deliver. That is about £1,314 of sales at risk on this line alone.

MSC West — Feltham holds 224 free, which is 22 days of cover against a forecast of 10.2 a day. Selden Research needs 21 days and class A carries 7 days of safety stock, so the target position is 286 units. Neither depot has spare cover, so buy 70 from Selden Research.
Do nothing and MSC West — Feltham runs out on 18/09/2026, which is 22 days. Selden Research needs 21 days to deliver. That is about £1,205 of sales at risk on this line alone.

MSC West — Feltham holds 114 free, which is 17 days of cover against a forecast of 6.7 a day. Northwood Hygiene Products needs 12 days and class A carries 7 days of safety stock, so the target position is 128 units. Neither depot has spare cover, so buy 18 from Northwood Hygiene Products.
Do nothing and MSC West — Feltham runs out on 13/09/2026, which is 17 days. Northwood Hygiene Products needs 12 days to deliver. That is about £811 of sales at risk on this line alone.

MSC West — Feltham holds 2 free, which is 14 days of cover against a forecast of 0.1 a day. Numatic needs 8 days and class A carries 7 days of safety stock, so the target position is 3 units. Neither depot has spare cover, so buy 1 from Numatic.
Do nothing and MSC West — Feltham runs out on 10/09/2026, which is 14 days. Numatic needs 8 days to deliver. That is about £691 of sales at risk on this line alone.
Products, suppliers, prices and case multiples are MSC's real range. Demand history, lead times and supplier terms are derived for the demo, deterministically, so the figures never move between screens. An asterisk on a lead time means the supplier record carries none and fourteen days was assumed, the same gap the audit found on about 19,900 SKUs. Signed in as Duncan Cusack.