DC

Purchasing

Live144 to decide
the buying decisions waiting on you this morninga transfer is weighed before every purchaseaccepting one raises the order, nothing is re-keyed
This morningWorst cover first

0 of 144 decided, 144 to go. 66 of those run out before their supplier could deliver, so they are at the top. £156,207 of buying is proposed and 54 lines can be covered by moving stock the group already owns.

  • 8383 lines have been waiting a week or moreThe oldest has sat here 15 days. Nothing on a queue announces itself, so the platform counts the days and puts them in front of you.Show these
  • 1515 lines have no lead time on their supplier recordFourteen days is assumed on those lines and the confidence is marked down to say so. The assumption is on the line, never hidden inside the figure.Show these
  • 2222 lines sit under their supplier minimum on their ownEach one is combined onto that supplier's draft order rather than shipped alone, so the minimum is met and carriage is not paid twice.Show these
  • 2222 lines carry a one-off monthA mobilisation or a contract pause is excluded from the forecast rather than left to inflate the next order. The exclusion is stated on the line so a buyer can disagree with it.Show these
The platform counts these so a person does not have to. Take up here is 0 per cent this session against the 1.5 per cent NETSTOCK managed over six months, because deciding one no longer means a download and a re-key.
Jangro Premium Mini Jumbo Toilet Roll 2 Ply 200m x12MAT001 · Lucart Hygiene · MSC East — Brentwood · class A
NextWatchTransfer then buyWaiting 12 days76% Medium
Jangro Premium Mini Jumbo Toilet Roll 2 Ply 200m x12

MSC East — Brentwood holds 34 free, which is 4 days of cover against a forecast of 8.4 a day. Lucart Hygiene needs 8 days and class A carries 7 days of safety stock, so the target position is 126 units. MSC West — Feltham can release 55, so move 55 first and buy the remaining 42 from Lucart Hygiene.

Do nothing and MSC East — Brentwood runs out on 31/08/2026, which is 4 days. Lucart Hygiene needs 8 days to deliver. That is about £2,419 of sales at risk on this line alone.

Transfer first: MSC West — Feltham can release 55 without dropping below its own cover. Moving 55 arrives next day on the trunk run for £101.66 of handling, holds back £1,308 of spend and avoids 39.2 kg CO2e.

Free now34Inbound0Forecast a day8.4Cover4dLead time8dOut on31/08/2026Recommended42At cost£999
QuantityThe engine says 42ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 76 per cent, medium, because demand varies by 14 per cent month to month. See the working
Jangro Contract Refuse Black Sack 18x29x38"x 200 5kgHPC036 · JPK TRADE SUPPLIES · MSC East — Brentwood · class A
WatchTransfer, no buyWaiting 11 days86% High
Jangro Contract Refuse Black Sack 18x29x38"x 200 5kg

MSC East — Brentwood holds 144 free, which is 19 days of cover against a forecast of 7.6 a day. JPK TRADE SUPPLIES needs 19 days and class A carries 7 days of safety stock, so the target position is 198 units. MSC West — Feltham can release 64 without going short, so move 54 on tomorrow's trunk run and buy nothing.

Do nothing and MSC East — Brentwood runs out on 15/09/2026, which is 19 days. JPK TRADE SUPPLIES needs 19 days to deliver. That is about £2,257 of sales at risk on this line alone.

Transfer first: MSC West — Feltham can release 64 without dropping below its own cover. Moving 54 arrives next day on the trunk run for £71.76 of handling, holds back £498 of spend and avoids 26.6 kg CO2e.

Free now144Inbound0Forecast a day7.6Cover19dLead time19dOut on15/09/2026Recommended54At cost£0
QuantityThe engine says 54ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 86 per cent, high, because demand varies by 8 per cent month to month. See the working
Numatic NX Range RSB150NX RucSac Battery Vacuum - Two BatteryNUM084 · Numatic · MSC East — Brentwood · class A
WatchBuy45% Low
Numatic NX Range RSB150NX RucSac Battery Vacuum - Two Battery

MSC East — Brentwood holds 2 free with 2 already inbound, which is 15 days of cover against a forecast of 0.3 a day. Numatic needs 8 days and class A carries 7 days of safety stock, so the target position is 5 units. Neither depot has spare cover, so buy 1 from Numatic.

Do nothing and MSC East — Brentwood runs out on 03/09/2026, which is 7 days. Numatic needs 8 days to deliver. That is about £2,037 of sales at risk on this line alone.

Free now2Inbound2Forecast a day0.3Cover15dLead time8dOut on03/09/2026Recommended1At cost£742
QuantityThe engine says 1ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 45 per cent, low, because demand varies by 30 per cent month to month and a one-off month sits in the history. See the working
Jangro Blue Nitrile Gloves Small 100 Pack - DG150‑SUNI100 · Supermax Healthcare · MSC West — Feltham · class A
WatchBuyWaiting 14 days78% Medium
Jangro Blue Nitrile Gloves Small 100 Pack - DG150‑S

MSC West — Feltham holds 44 free with 25 already inbound, which is 10 days of cover against a forecast of 6.6 a day. Supermax Healthcare needs 12 days and class A carries 7 days of safety stock, so the target position is 127 units. Neither depot has spare cover, so buy 60 from Supermax Healthcare.

Do nothing and MSC West — Feltham runs out on 02/09/2026, which is 7 days. Supermax Healthcare needs 12 days to deliver. That is about £1,435 of sales at risk on this line alone.

Free now44Inbound25Forecast a day6.6Cover10dLead time12dOut on02/09/2026Recommended60At cost£713
QuantityThe engine says 60ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 78 per cent, medium, because demand varies by 13 per cent month to month. See the working
Jangro Coreless Micro Mini Toilet Roll 2 Ply 100m x12KRU059 · Northwood Hygiene Products · MSC West — Feltham · class A
WatchBuyWaiting 13 days53% Low
Jangro Coreless Micro Mini Toilet Roll 2 Ply 100m x12

MSC West — Feltham holds 20 free, which is 9 days of cover against a forecast of 2.2 a day. Northwood Hygiene Products needs 12 days and class A carries 7 days of safety stock, so the target position is 42 units. Neither depot has spare cover, so buy 24 from Northwood Hygiene Products.

Do nothing and MSC West — Feltham runs out on 05/09/2026, which is 9 days. Northwood Hygiene Products needs 12 days to deliver. That is about £1,412 of sales at risk on this line alone.

Free now20Inbound0Forecast a day2.2Cover9dLead time12dOut on05/09/2026Recommended24At cost£771
QuantityThe engine says 24ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 53 per cent, low, because demand varies by 25 per cent month to month and a one-off month sits in the history. See the working
Jangro Blue Nitrile Gloves Medium 100 Pack - DG150‑MUNI101 · Supermax Healthcare · MSC East — Brentwood · class A
WatchBuyWaiting 11 days77% Medium
Jangro Blue Nitrile Gloves Medium 100 Pack - DG150‑M

MSC East — Brentwood holds 58 free, which is 11 days of cover against a forecast of 5.3 a day. Supermax Healthcare needs 12 days and class A carries 7 days of safety stock, so the target position is 101 units. Neither depot has spare cover, so buy 50 from Supermax Healthcare.

Do nothing and MSC East — Brentwood runs out on 07/09/2026, which is 11 days. Supermax Healthcare needs 12 days to deliver. That is about £1,138 of sales at risk on this line alone.

Free now58Inbound0Forecast a day5.3Cover11dLead time12dOut on07/09/2026Recommended50At cost£495
QuantityThe engine says 50ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 77 per cent, medium, because demand varies by 14 per cent month to month. See the working
Jangro Toilet Roll 2 Ply 200 Sheets 4 PackSCA020 · Northwood Hygiene Products · MSC West — Feltham · class A
WatchBuy82% High
Jangro Toilet Roll 2 Ply 200 Sheets 4 Pack

MSC West — Feltham holds 46 free, which is 11 days of cover against a forecast of 4.2 a day. Northwood Hygiene Products needs 12 days and class A carries 7 days of safety stock, so the target position is 80 units. Neither depot has spare cover, so buy 40 from Northwood Hygiene Products.

Do nothing and MSC West — Feltham runs out on 07/09/2026, which is 11 days. Northwood Hygiene Products needs 12 days to deliver. That is about £914 of sales at risk on this line alone.

Free now46Inbound0Forecast a day4.2Cover11dLead time12dOut on07/09/2026Recommended40At cost£483
QuantityThe engine says 40ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 82 per cent, high, because demand varies by 10 per cent month to month. See the working
BioVate Multipurpose Surface Clean 1LBIODOSY42300L · Biovate Hygienics - Chemanglia · MSC West — Feltham · class A
WatchTransfer then buyWaiting 11 days83% High
BioVate Multipurpose Surface Clean 1L

MSC West — Feltham holds 62 free, which is 13 days of cover against a forecast of 4.6 a day. Biovate Hygienics - Chemanglia needs 16 days and class A carries 7 days of safety stock, so the target position is 107 units. MSC East — Brentwood can release 37, so move 37 first and buy the remaining 10 from Biovate Hygienics - Chemanglia.

Do nothing and MSC West — Feltham runs out on 09/09/2026, which is 13 days. Biovate Hygienics - Chemanglia needs 16 days to deliver. That is about £878 of sales at risk on this line alone.

Transfer first: MSC East — Brentwood can release 37 without dropping below its own cover. Moving 37 arrives next day on the trunk run for £20.54 of handling, holds back £284 of spend and avoids 4.9 kg CO2e.

Free now62Inbound0Forecast a day4.6Cover13dLead time16dOut on09/09/2026Recommended10At cost£77
QuantityThe engine says 10ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 83 per cent, high, because demand varies by 10 per cent month to month. See the working
Back73 to 80 of 144Next 8 lines

Products, suppliers, prices and case multiples are MSC's real range. Demand history, lead times and supplier terms are derived for the demo, deterministically, so the figures never move between screens. An asterisk on a lead time means the supplier record carries none and fourteen days was assumed, the same gap the audit found on about 19,900 SKUs. Signed in as Duncan Cusack.