DC

Purchasing

Live144 to decide
Today: NETSTOCK, hand-keyed into BC
the buying decisions waiting on you this morninga transfer is weighed before every purchaseaccepting one raises the order, nothing is re-keyed
Replaces: the NETSTOCK download, re-keyed into Business Central by hand
This morningWorst cover first

0 of 144 decided, 144 to go. 66 of those run out before their supplier could deliver, so they are at the top. £156,207 of buying is proposed and 54 lines can be covered by moving stock the group already owns.

  • 8383 lines have been waiting a week or moreThe oldest has sat here 15 days. Nothing on a queue announces itself, so the platform counts the days and puts them in front of you.Show these
  • 1515 lines have no lead time on their supplier recordFourteen days is assumed on those lines and the confidence is marked down to say so. The assumption is on the line, never hidden inside the figure.Show these
  • 2222 lines sit under their supplier minimum on their ownEach one is combined onto that supplier's draft order rather than shipped alone, so the minimum is met and carriage is not paid twice.Show these
  • 2222 lines carry a one-off monthA mobilisation or a contract pause is excluded from the forecast rather than left to inflate the next order. The exclusion is stated on the line so a buyer can disagree with it.Show these
The platform counts these so a person does not have to. Take up here is 0 per cent this session against the 1.5 per cent NETSTOCK managed over six months, because deciding one no longer means a download and a re-key.
Speedy Flat Mop Bucket & Wringer RedCON283 · Robert Scott · MSC East — Brentwood · class A
NextCriticalBuyWaiting 14 days80% High
Speedy Flat Mop Bucket & Wringer Red

MSC East — Brentwood holds 2 free with 29 already inbound, which is 7 days of cover against a forecast of 4.7 a day. Robert Scott needs 10 days and class A carries 7 days of safety stock, so the target position is 80 units. Neither depot has spare cover, so buy 50 from Robert Scott.

Do nothing and MSC East — Brentwood runs out on 27/08/2026, which is 0 days. Robert Scott needs 10 days to deliver. That is about £2,489 of sales at risk on this line alone.

Free now2Inbound29Forecast a day4.7Cover7dLead time10dOut on27/08/2026Recommended50At cost£1,709
QuantityThe engine says 50ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 80 per cent, high, because demand varies by 12 per cent month to month. See the working
Jangro Premium Jumbo Toilet Roll 2 Ply 400m x6MAT003 · Lucart Hygiene · MSC West — Feltham · class A
CriticalTransfer then buyWaiting 8 days80% High
Jangro Premium Jumbo Toilet Roll 2 Ply 400m x6

MSC West — Feltham holds 0 free, which is under a day of cover against a forecast of 8.5 a day. Lucart Hygiene needs 8 days and class A carries 7 days of safety stock, so the target position is 129 units. MSC East — Brentwood can release 100, so move 100 first and buy the remaining 30 from Lucart Hygiene.

Do nothing and MSC West — Feltham is already out, so every order for this line goes short until something arrives. That is about 68 units of demand across the lead time. That is about £2,460 of sales at risk on this line alone.

Transfer first: MSC East — Brentwood can release 100 without dropping below its own cover. Moving 100 arrives next day on the trunk run for £201.40 of handling, holds back £2,018 of spend and avoids 81.4 kg CO2e.

Free now0Inbound0Forecast a day8.5Cover0dLead time8dOut on27/08/2026Recommended30At cost£605
QuantityThe engine says 30ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 80 per cent, high, because demand varies by 12 per cent month to month. See the working
Jangro Premium Ultra Soft Toilet Tissue 2 Ply 40 x 280 SheetsSOF002 · Sofidel UK · MSC East — Brentwood · class A
CriticalBuyWaiting 11 days56% Low
Jangro Premium Ultra Soft Toilet Tissue 2 Ply 40 x 280 Sheets

MSC East — Brentwood holds 16 free, which is 3 days of cover against a forecast of 4.9 a day. Sofidel UK needs 16 days and class A carries 7 days of safety stock, so the target position is 112 units. Neither depot has spare cover, so buy 96 from Sofidel UK.

Do nothing and MSC East — Brentwood runs out on 30/08/2026, which is 3 days. Sofidel UK needs 16 days to deliver. That is about £2,150 of sales at risk on this line alone.

Free now16Inbound0Forecast a day4.9Cover3dLead time16dOut on30/08/2026Recommended96At cost£1,568
QuantityThe engine says 96ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 56 per cent, low, because demand varies by 23 per cent month to month and a one-off month sits in the history. See the working
Jangro Blue Nitrile Gloves Medium 100 Pack - DG150‑MUNI101 · Supermax Healthcare · MSC West — Feltham · class A
CriticalBuy77% Medium
Jangro Blue Nitrile Gloves Medium 100 Pack - DG150‑M

MSC West — Feltham holds 0 free with 12 already inbound, which is 1 days of cover against a forecast of 9.5 a day. Supermax Healthcare needs 12 days and class A carries 7 days of safety stock, so the target position is 181 units. Neither depot has spare cover, so buy 170 from Supermax Healthcare.

Do nothing and MSC West — Feltham is already out, so every order for this line goes short until something arrives. That is about 114 units of demand across the lead time. That is about £2,048 of sales at risk on this line alone.

Free now0Inbound12Forecast a day9.5Cover1dLead time12dOut on27/08/2026Recommended170At cost£1,683
QuantityThe engine says 170ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 77 per cent, medium, because demand varies by 14 per cent month to month. See the working
Jangro Toilet Roll 2 Ply 200 Sheets 4 PackSCA020 · Northwood Hygiene Products · MSC East — Brentwood · class A
CriticalBuy78% Medium
Jangro Toilet Roll 2 Ply 200 Sheets 4 Pack

MSC East — Brentwood holds 54 free, which is 6 days of cover against a forecast of 9.2 a day. Northwood Hygiene Products needs 12 days and class A carries 7 days of safety stock, so the target position is 175 units. Neither depot has spare cover, so buy 130 from Northwood Hygiene Products.

Do nothing and MSC East — Brentwood runs out on 02/09/2026, which is 6 days. Northwood Hygiene Products needs 12 days to deliver. That is about £2,017 of sales at risk on this line alone.

Free now54Inbound0Forecast a day9.2Cover6dLead time12dOut on02/09/2026Recommended130At cost£1,570
QuantityThe engine says 130ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 78 per cent, medium, because demand varies by 13 per cent month to month. See the working
Jangro Contract Pearlised Soap 5LBIO051 · Selden Research · MSC West — Feltham · class A
CriticalTransfer then buyWaiting 11 days80% High
Jangro Contract Pearlised Soap 5L

MSC West — Feltham holds 22 free with 10 already inbound, which is 3 days of cover against a forecast of 11.0 a day. Selden Research needs 21 days and class A carries 7 days of safety stock, so the target position is 308 units. MSC East — Brentwood can release 44, so move 44 first and buy the remaining 240 from Selden Research.

Do nothing and MSC West — Feltham runs out on 29/08/2026, which is 2 days. Selden Research needs 21 days to deliver. That is about £1,737 of sales at risk on this line alone.

Transfer first: MSC East — Brentwood can release 44 without dropping below its own cover. Moving 44 arrives next day on the trunk run for £71.00 of handling, holds back £189 of spend and avoids 26.2 kg CO2e.

Free now22Inbound10Forecast a day11.0Cover3dLead time21dOut on29/08/2026Recommended240At cost£1,030
QuantityThe engine says 240ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 80 per cent, high, because demand varies by 12 per cent month to month. See the working
Jangro Blue Nitrile Gloves Large 100 Pack - DG150‑LUNI102 · Supermax Healthcare · MSC East — Brentwood · class A
CriticalBuyWaiting 14 days79% Medium
Jangro Blue Nitrile Gloves Large 100 Pack - DG150‑L

MSC East — Brentwood holds 0 free with 17 already inbound, which is 2 days of cover against a forecast of 8.0 a day. Supermax Healthcare needs 12 days and class A carries 7 days of safety stock, so the target position is 152 units. Neither depot has spare cover, so buy 140 from Supermax Healthcare.

Do nothing and MSC East — Brentwood is already out, so every order for this line goes short until something arrives. That is about 96 units of demand across the lead time. That is about £1,720 of sales at risk on this line alone.

Free now0Inbound17Forecast a day8.0Cover2dLead time12dOut on27/08/2026Recommended140At cost£1,411
QuantityThe engine says 140ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 79 per cent, medium, because demand varies by 13 per cent month to month. See the working
BioVate Washroom Cleaner 1LBIODOSY42600L · Biovate Hygienics - Chemanglia · MSC West — Feltham · class A
CriticalBuy73% Medium
BioVate Washroom Cleaner 1L

MSC West — Feltham holds 54 free with 25 already inbound, which is 9 days of cover against a forecast of 8.8 a day. Biovate Hygienics - Chemanglia needs 16 days and class A carries 7 days of safety stock, so the target position is 203 units. Neither depot has spare cover, so buy 130 from Biovate Hygienics - Chemanglia.

Do nothing and MSC West — Feltham runs out on 02/09/2026, which is 6 days. Biovate Hygienics - Chemanglia needs 16 days to deliver. That is about £1,645 of sales at risk on this line alone.

Free now54Inbound25Forecast a day8.8Cover9dLead time16dOut on02/09/2026Recommended130At cost£1,004
QuantityThe engine says 130ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 73 per cent, medium, because demand varies by 17 per cent month to month. See the working
Back9 to 16 of 144Next 8 lines

Products, suppliers, prices and case multiples are MSC's real range. Demand history, lead times and supplier terms are derived for the demo, deterministically, so the figures never move between screens. An asterisk on a lead time means the supplier record carries none and fourteen days was assumed, the same gap the audit found on about 19,900 SKUs. Signed in as Duncan Cusack.