Live144 to decide0 of 144 decided, 144 to go. 66 of those run out before their supplier could deliver, so they are at the top. £156,207 of buying is proposed and 54 lines can be covered by moving stock the group already owns.
- 8383 lines have been waiting a week or moreThe oldest has sat here 15 days. Nothing on a queue announces itself, so the platform counts the days and puts them in front of you.Show these
- 1515 lines have no lead time on their supplier recordFourteen days is assumed on those lines and the confidence is marked down to say so. The assumption is on the line, never hidden inside the figure.Show these
- 2222 lines sit under their supplier minimum on their ownEach one is combined onto that supplier's draft order rather than shipped alone, so the minimum is met and carriage is not paid twice.Show these
- 2222 lines carry a one-off monthA mobilisation or a contract pause is excluded from the forecast rather than left to inflate the next order. The exclusion is stated on the line so a buyer can disagree with it.Show these

MSC East — Brentwood holds 144 free, which is 19 days of cover against a forecast of 7.6 a day. JPK TRADE SUPPLIES needs 19 days and class A carries 7 days of safety stock, so the target position is 198 units. MSC West — Feltham can release 64 without going short, so move 54 on tomorrow's trunk run and buy nothing.
Do nothing and MSC East — Brentwood runs out on 15/09/2026, which is 19 days. JPK TRADE SUPPLIES needs 19 days to deliver. That is about £2,257 of sales at risk on this line alone.
Transfer first: MSC West — Feltham can release 64 without dropping below its own cover. Moving 54 arrives next day on the trunk run for £71.76 of handling, holds back £498 of spend and avoids 26.6 kg CO2e.

MSC East — Brentwood holds 2 free with 2 already inbound, which is 15 days of cover against a forecast of 0.3 a day. Numatic needs 8 days and class A carries 7 days of safety stock, so the target position is 5 units. Neither depot has spare cover, so buy 1 from Numatic.
Do nothing and MSC East — Brentwood runs out on 03/09/2026, which is 7 days. Numatic needs 8 days to deliver. That is about £2,037 of sales at risk on this line alone.

MSC East — Brentwood holds 58 free, which is 11 days of cover against a forecast of 5.3 a day. Supermax Healthcare needs 12 days and class A carries 7 days of safety stock, so the target position is 101 units. Neither depot has spare cover, so buy 50 from Supermax Healthcare.
Do nothing and MSC East — Brentwood runs out on 07/09/2026, which is 11 days. Supermax Healthcare needs 12 days to deliver. That is about £1,138 of sales at risk on this line alone.

MSC East — Brentwood holds 102 free, which is 14 days of cover against a forecast of 7.2 a day. Selden Research needs 21 days and class A carries 7 days of safety stock, so the target position is 201 units. Neither depot has spare cover, so buy 100 from Selden Research.
Do nothing and MSC East — Brentwood runs out on 10/09/2026, which is 14 days. Selden Research needs 21 days to deliver. That is about £752 of sales at risk on this line alone.

MSC East — Brentwood holds 150 free, which is 15 days of cover against a forecast of 10.3 a day. Selden Research needs 21 days and class A carries 7 days of safety stock, so the target position is 289 units. Neither depot has spare cover, so buy 140 from Selden Research.
Do nothing and MSC East — Brentwood runs out on 10/09/2026, which is 15 days. Selden Research needs 21 days to deliver. That is about £721 of sales at risk on this line alone.

MSC East — Brentwood holds 54 free with 43 already inbound, which is 18 days of cover against a forecast of 5.3 a day. Northwood Hygiene Products needs 12 days and class A carries 7 days of safety stock, so the target position is 101 units. Neither depot has spare cover, so buy 6 from Northwood Hygiene Products.
Do nothing and MSC East — Brentwood runs out on 06/09/2026, which is 10 days. Northwood Hygiene Products needs 12 days to deliver. That is about £637 of sales at risk on this line alone.

MSC East — Brentwood holds 54 free, which is 8 days of cover against a forecast of 6.7 a day. Robert Scott needs 10 days and class A carries 7 days of safety stock, so the target position is 115 units. MSC West — Feltham can release 53, so move 53 first and buy the remaining 10 from Robert Scott.
Do nothing and MSC East — Brentwood runs out on 04/09/2026, which is 8 days. Robert Scott needs 10 days to deliver. That is about £288 of sales at risk on this line alone.
Transfer first: MSC West — Feltham can release 53 without dropping below its own cover. Moving 53 arrives next day on the trunk run for £9.96 of handling, holds back £125 of spend and avoids 0.4 kg CO2e.

MSC East — Brentwood holds 26 free, which is 6 days of cover against a forecast of 4.7 a day. Harrison Wipes needs 6 days and class A carries 7 days of safety stock, so the target position is 62 units. MSC West — Feltham can release 65 without going short, so move 36 on tomorrow's trunk run and buy nothing.
Do nothing and MSC East — Brentwood runs out on 01/09/2026, which is 6 days. Harrison Wipes needs 6 days to deliver. That is about £230 of sales at risk on this line alone.
Transfer first: MSC West — Feltham can release 65 without dropping below its own cover. Moving 36 arrives next day on the trunk run for £12.74 of handling, holds back £182 of spend and avoids 1.6 kg CO2e.
Products, suppliers, prices and case multiples are MSC's real range. Demand history, lead times and supplier terms are derived for the demo, deterministically, so the figures never move between screens. An asterisk on a lead time means the supplier record carries none and fourteen days was assumed, the same gap the audit found on about 19,900 SKUs. Signed in as Duncan Cusack.