DC

Purchasing

Live144 to decide
Today: NETSTOCK, hand-keyed into BC
the buying decisions waiting on you this morninga transfer is weighed before every purchaseaccepting one raises the order, nothing is re-keyed
Replaces: the NETSTOCK download, re-keyed into Business Central by hand
This morningWorst cover first

0 of 144 decided, 144 to go. 66 of those run out before their supplier could deliver, so they are at the top. £156,207 of buying is proposed and 54 lines can be covered by moving stock the group already owns.

  • 8383 lines have been waiting a week or moreThe oldest has sat here 15 days. Nothing on a queue announces itself, so the platform counts the days and puts them in front of you.Show these
  • 1515 lines have no lead time on their supplier recordFourteen days is assumed on those lines and the confidence is marked down to say so. The assumption is on the line, never hidden inside the figure.Show these
  • 2222 lines sit under their supplier minimum on their ownEach one is combined onto that supplier's draft order rather than shipped alone, so the minimum is met and carriage is not paid twice.Show these
  • 2222 lines carry a one-off monthA mobilisation or a contract pause is excluded from the forecast rather than left to inflate the next order. The exclusion is stated on the line so a buyer can disagree with it.Show these
The platform counts these so a person does not have to. Take up here is 0 per cent this session against the 1.5 per cent NETSTOCK managed over six months, because deciding one no longer means a download and a re-key.
Speedy Flat Mop Bucket & Wringer Yellow HB040-Y 101248 YCON358 · Robert Scott · MSC East — Brentwood · class A
NextCriticalBuyWaiting 13 days81% High
Speedy Flat Mop Bucket & Wringer Yellow HB040-Y 101248 Y

MSC East — Brentwood holds 20 free with 8 already inbound, which is 3 days of cover against a forecast of 8.0 a day. Robert Scott needs 10 days and class A carries 7 days of safety stock, so the target position is 137 units. Neither depot has spare cover, so buy 110 from Robert Scott.

Do nothing and MSC East — Brentwood runs out on 29/08/2026, which is 2 days. Robert Scott needs 10 days to deliver. That is about £4,282 of sales at risk on this line alone.

Free now20Inbound8Forecast a day8.0Cover3dLead time10dOut on29/08/2026Recommended110At cost£3,819
QuantityThe engine says 110ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 81 per cent, high, because demand varies by 11 per cent month to month. See the working
Jangro Professional Toilet Roll 2 Ply 320 SheetsSCA019 · Northwood Hygiene Products · MSC East — Brentwood · class A
CriticalTransfer then buy74% Medium
Jangro Professional Toilet Roll 2 Ply 320 Sheets

MSC East — Brentwood holds 14 free with 27 already inbound, which is 4 days of cover against a forecast of 9.8 a day. Northwood Hygiene Products needs 12 days and class A carries 7 days of safety stock, so the target position is 186 units. MSC West — Feltham can release 113, so move 113 first and buy the remaining 40 from Northwood Hygiene Products.

Do nothing and MSC East — Brentwood runs out on 28/08/2026, which is 1 days. Northwood Hygiene Products needs 12 days to deliver. That is about £3,063 of sales at risk on this line alone.

Transfer first: MSC West — Feltham can release 113 without dropping below its own cover. Moving 113 arrives next day on the trunk run for £117.71 of handling, holds back £1,953 of spend and avoids 46 kg CO2e.

Free now14Inbound27Forecast a day9.8Cover4dLead time12dOut on28/08/2026Recommended40At cost£691
QuantityThe engine says 40ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 74 per cent, medium, because demand varies by 16 per cent month to month. See the working
Jangro Professional Mini Jumbo Toilet Roll 2 Ply 150m x12MAT005 · Northwood Hygiene Products · MSC East — Brentwood · class A
CriticalTransfer then buy83% High
Jangro Professional Mini Jumbo Toilet Roll 2 Ply 150m x12

MSC East — Brentwood holds 42 free, which is 5 days of cover against a forecast of 8.7 a day. Northwood Hygiene Products needs 12 days and class A carries 7 days of safety stock, so the target position is 166 units. MSC West — Feltham can release 44, so move 44 first and buy the remaining 84 from Northwood Hygiene Products.

Do nothing and MSC East — Brentwood runs out on 01/09/2026, which is 5 days. Northwood Hygiene Products needs 12 days to deliver. That is about £2,991 of sales at risk on this line alone.

Transfer first: MSC West — Feltham can release 44 without dropping below its own cover. Moving 44 arrives next day on the trunk run for £67.34 of handling, holds back £778 of spend and avoids 24.7 kg CO2e.

Free now42Inbound0Forecast a day8.7Cover5dLead time12dOut on01/09/2026Recommended84At cost£1,486
QuantityThe engine says 84ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 83 per cent, high, because demand varies by 9 per cent month to month. See the working
Speedy Flat Mop Bucket & Wringer RedCON283 · Robert Scott · MSC East — Brentwood · class A
CriticalBuyWaiting 14 days80% High
Speedy Flat Mop Bucket & Wringer Red

MSC East — Brentwood holds 2 free with 29 already inbound, which is 7 days of cover against a forecast of 4.7 a day. Robert Scott needs 10 days and class A carries 7 days of safety stock, so the target position is 80 units. Neither depot has spare cover, so buy 50 from Robert Scott.

Do nothing and MSC East — Brentwood runs out on 27/08/2026, which is 0 days. Robert Scott needs 10 days to deliver. That is about £2,489 of sales at risk on this line alone.

Free now2Inbound29Forecast a day4.7Cover7dLead time10dOut on27/08/2026Recommended50At cost£1,709
QuantityThe engine says 50ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 80 per cent, high, because demand varies by 12 per cent month to month. See the working
Jangro Premium Ultra Soft Toilet Tissue 2 Ply 40 x 280 SheetsSOF002 · Sofidel UK · MSC East — Brentwood · class A
CriticalBuyWaiting 11 days56% Low
Jangro Premium Ultra Soft Toilet Tissue 2 Ply 40 x 280 Sheets

MSC East — Brentwood holds 16 free, which is 3 days of cover against a forecast of 4.9 a day. Sofidel UK needs 16 days and class A carries 7 days of safety stock, so the target position is 112 units. Neither depot has spare cover, so buy 96 from Sofidel UK.

Do nothing and MSC East — Brentwood runs out on 30/08/2026, which is 3 days. Sofidel UK needs 16 days to deliver. That is about £2,150 of sales at risk on this line alone.

Free now16Inbound0Forecast a day4.9Cover3dLead time16dOut on30/08/2026Recommended96At cost£1,568
QuantityThe engine says 96ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 56 per cent, low, because demand varies by 23 per cent month to month and a one-off month sits in the history. See the working
Jangro Toilet Roll 2 Ply 200 Sheets 4 PackSCA020 · Northwood Hygiene Products · MSC East — Brentwood · class A
CriticalBuy78% Medium
Jangro Toilet Roll 2 Ply 200 Sheets 4 Pack

MSC East — Brentwood holds 54 free, which is 6 days of cover against a forecast of 9.2 a day. Northwood Hygiene Products needs 12 days and class A carries 7 days of safety stock, so the target position is 175 units. Neither depot has spare cover, so buy 130 from Northwood Hygiene Products.

Do nothing and MSC East — Brentwood runs out on 02/09/2026, which is 6 days. Northwood Hygiene Products needs 12 days to deliver. That is about £2,017 of sales at risk on this line alone.

Free now54Inbound0Forecast a day9.2Cover6dLead time12dOut on02/09/2026Recommended130At cost£1,570
QuantityThe engine says 130ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 78 per cent, medium, because demand varies by 13 per cent month to month. See the working
Jangro Blue Nitrile Gloves Large 100 Pack - DG150‑LUNI102 · Supermax Healthcare · MSC East — Brentwood · class A
CriticalBuyWaiting 14 days79% Medium
Jangro Blue Nitrile Gloves Large 100 Pack - DG150‑L

MSC East — Brentwood holds 0 free with 17 already inbound, which is 2 days of cover against a forecast of 8.0 a day. Supermax Healthcare needs 12 days and class A carries 7 days of safety stock, so the target position is 152 units. Neither depot has spare cover, so buy 140 from Supermax Healthcare.

Do nothing and MSC East — Brentwood is already out, so every order for this line goes short until something arrives. That is about 96 units of demand across the lead time. That is about £1,720 of sales at risk on this line alone.

Free now0Inbound17Forecast a day8.0Cover2dLead time12dOut on27/08/2026Recommended140At cost£1,411
QuantityThe engine says 140ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 79 per cent, medium, because demand varies by 13 per cent month to month. See the working
Jangro Blast Aerosol Fresh Cranberry 750mlSOL016 · Selden Research · MSC East — Brentwood · class A
CriticalBuy77% Medium
Jangro Blast Aerosol Fresh Cranberry 750ml

MSC East — Brentwood holds 18 free, which is 2 days of cover against a forecast of 10.4 a day. Selden Research needs 21 days and class A carries 7 days of safety stock, so the target position is 291 units. Neither depot has spare cover, so buy 280 from Selden Research.

Do nothing and MSC East — Brentwood runs out on 29/08/2026, which is 2 days. Selden Research needs 21 days to deliver. That is about £1,233 of sales at risk on this line alone.

Free now18Inbound0Forecast a day10.4Cover2dLead time21dOut on29/08/2026Recommended280At cost£983
QuantityThe engine says 280ReasonNeeded if you change the figure or refuse it
Nothing reaches a supplier until a person sends the order.
Confidence 77 per cent, medium, because demand varies by 14 per cent month to month. See the working
1 to 8 of 64Next 8 lines

Products, suppliers, prices and case multiples are MSC's real range. Demand history, lead times and supplier terms are derived for the demo, deterministically, so the figures never move between screens. An asterisk on a lead time means the supplier record carries none and fourteen days was assumed, the same gap the audit found on about 19,900 SKUs. Signed in as Duncan Cusack.