DC

Portwest White Coverall PP 40g Large

LiveCritical
Today: NETSTOCK, hand-keyed into BC
ST11WHL · Portwest ClothingMSC West — FelthamClass B · confidence 78 per cent, medium
Replaces: a NETSTOCK spreadsheet row with no working shown
What the engine saysPlain English first, the arithmetic underneath

MSC West — Feltham holds 0 free, which is under a day of cover against a forecast of 7.9 a day. Portwest Clothing needs 18 days and class B carries 10 days of safety stock, so the target position is 221 units. Neither depot has spare cover, so buy 230 from Portwest Clothing.

Do nothing and MSC West — Feltham is already out, so every order for this line goes short until something arrives. That is about 142 units of demand across the lead time. That is about £265 of sales at risk on this line alone.

Runs out27/08/2026Supplier needs18 daysUses a month236Sales at risk£265On the queue7 daysConfidence
Every figure on this page is the one the order will carry. Accepting the line copies none of it by hand.
Cover against lead timeFree stock running down, day by day
Safety stock 79Supplier arrives day 18Out on day 0790todayday 35
The blue line is free stock falling at the forecast rate. The dashed marker is the earliest a supplier delivery could land. Where the line reaches zero first, the depot is short and no amount of ordering on the day it happens will fix it.
Twelve months of demandMSC West — Feltham
AugSepOctNovDecJanFebMarAprMayJunJul
No one-off month found in the last year. Variability is 13 per cent of the mean, which is what sets the confidence on this line.
Eight weeks aheadForecast inside its confidence band
70027 Aug10 Sep24 Sep8 Oct
PPE runs at 90 per cent of an average month now and 106 per cent next month, which the forecast already carries.
The calculationEvery figure the engine used, in the order it used it
StepWhyUnits
Free stock at the depot23 on hand less 23 already allocated to orders0
Open purchase orders inboundNothing on the water0
Position the engine works fromFree stock plus what is already inbound0
Forecast demand a dayEight weeks ahead, seasonally shaped, one-off months excluded7.88
Lead-time demand7.88 a day for 18 days from Portwest Clothing142
Safety stock, class BClass B carries 10 days of cover for the variability this line shows79
Target positionLead-time demand plus safety stock221
ShortfallTarget position less the position now, which is why this line is on the queue221
Rounded to the supplier multiplePortwest Clothing ships in cases of 10230
Free stock at the depot
Why23 on hand less 23 already allocated to ordersUnits0
Open purchase orders inbound
WhyNothing on the waterUnits0
Position the engine works from
WhyFree stock plus what is already inboundUnits0
Forecast demand a day
WhyEight weeks ahead, seasonally shaped, one-off months excludedUnits7.88
Lead-time demand
Why7.88 a day for 18 days from Portwest ClothingUnits142
Safety stock, class B
WhyClass B carries 10 days of cover for the variability this line showsUnits79
Target position
WhyLead-time demand plus safety stockUnits221
Shortfall
WhyTarget position less the position now, which is why this line is on the queueUnits221
Rounded to the supplier multiple
WhyPortwest Clothing ships in cases of 10Units230
Confidence is 78 per cent because demand varies by 13 per cent month to month.
Buy or transferTransfers are weighed before purchases, every time
Transfer from the other depot

MSC East — Brentwood holds 64 free and needs all of it for its own cover, so there is nothing to move.

Buy from Portwest ClothingEngine leads with this
  • Order230 units, 23 cases of 10
  • ArrivesDay 18
  • Cost£246.10, carriage paid
  • Terms30 days, 2 per cent early · Supplier API
  • Supplier record74 per cent on time, 79 per cent in full
  • Minimum order£350, so this line is combined onto the supplier's order rather than shipped alone
Fulfil elsewhere and substitute are the other two options in the client's scope. They are named here and not yet built, because a substitution rule needs their own product data to be honest.
Your decisionThe engine recommends, you decide and the reason is kept
Accepting puts these units on PO-4716 for Portwest Clothing at MSC West — Feltham, carrying the figures above. Nothing reaches the supplier until a person sends it.

Products, suppliers, prices and case multiples are MSC's real range. Demand history, lead times and supplier terms are derived for the demo, deterministically, so the figures never move between screens.