Jangro Hand & Surface Wipes x100
LiveWatchToday: NETSTOCK, hand-keyed into BC
Replaces: a NETSTOCK spreadsheet row with no working shown
What the engine saysPlain English first, the arithmetic underneath

MSC West — Feltham holds 108 free, which is 13 days of cover against a forecast of 8.4 a day. PAL needs 14 days on the assumed lead time, none is on record and class A carries 7 days of safety stock, so the target position is 176 units. MSC East — Brentwood can release 105 without going short, so move 68 on tomorrow's trunk run and buy nothing.
Do nothing and MSC West — Feltham runs out on 09/09/2026, which is 13 days. PAL needs 14 days to deliver. That is about £725 of sales at risk on this line alone.
Runs out09/09/2026Supplier needs14 daysUses a month251Sales at risk£725On the queue11 daysConfidence
Every figure on this page is the one the order will carry. Accepting the line copies none of it by hand.
Cover against lead timeFree stock running down, day by day
The blue line is free stock falling at the forecast rate. The dashed marker is the earliest a supplier delivery could land. Where the line reaches zero first, the depot is short and no amount of ordering on the day it happens will fix it.
Twelve months of demandMSC West — Feltham
No one-off month found in the last year. Variability is 9 per cent of the mean, which is what sets the confidence on this line.
Eight weeks aheadForecast inside its confidence band
Microfibre & Cloths runs at 95 per cent of an average month now and 108 per cent next month, which the forecast already carries.
The calculationEvery figure the engine used, in the order it used it
| Step | Why | Units |
|---|---|---|
| Free stock at the depot | 123 on hand less 15 already allocated to orders | 108 |
| Open purchase orders inbound | Nothing on the water | 0 |
| Position the engine works from | Free stock plus what is already inbound | 108 |
| Forecast demand a day | Eight weeks ahead, seasonally shaped, one-off months excluded | 8.36 |
| Lead-time demand | 8.36 a day for 14 days from PAL, assumed because no lead time is on record | 117 |
| Safety stock, class A | Class A carries 7 days of cover for the variability this line shows | 59 |
| Target position | Lead-time demand plus safety stock | 176 |
| Shortfall | Target position less the position now, which is why this line is on the queue | 68 |
| Rounded to the supplier multiple | PAL ships in cases of 6 | 0 |
Free stock at the depot
Why123 on hand less 15 already allocated to ordersUnits108
Open purchase orders inbound
WhyNothing on the waterUnits0
Position the engine works from
WhyFree stock plus what is already inboundUnits108
Forecast demand a day
WhyEight weeks ahead, seasonally shaped, one-off months excludedUnits8.36
Lead-time demand
Why8.36 a day for 14 days from PAL, assumed because no lead time is on recordUnits117
Safety stock, class A
WhyClass A carries 7 days of cover for the variability this line showsUnits59
Target position
WhyLead-time demand plus safety stockUnits176
Shortfall
WhyTarget position less the position now, which is why this line is on the queueUnits68
Rounded to the supplier multiple
WhyPAL ships in cases of 6Units0
Confidence is 67 per cent because demand varies by 9 per cent month to month and the supplier record carries no lead time so fourteen days was assumed.
Buy or transferTransfers are weighed before purchases, every time
Transfer from the other depotEngine leads with this
- Move68 units from MSC East — Brentwood
- ArrivesNext day, on the trunk run
- Cost£17.84 of handling, nothing bought
- Cash held back£257
- Carbon3.7 kg CO2e avoided
- Safe to release105 units, after MSC East — Brentwood keeps its own cover
Buy from PAL
- Order0 units, 0 cases of 6
- ArrivesDay 14, assumed, no lead time on record
- Cost£0.00 plus £22.00 carriage, under the £250 threshold
- Terms60 days net · Supplier portal
- Supplier record87 per cent on time, 92 per cent in full
- Minimum order£250, met
Fulfil elsewhere and substitute are the other two options in the client's scope. They are named here and not yet built, because a substitution rule needs their own product data to be honest.
Your decisionThe engine recommends, you decide and the reason is kept
Accepting puts these units on PO-4723 for PAL at MSC West — Feltham, carrying the figures above. Nothing reaches the supplier until a person sends it.
Products, suppliers, prices and case multiples are MSC's real range. Demand history, lead times and supplier terms are derived for the demo, deterministically, so the figures never move between screens.