Jangro Alcohol Hand Gel 1L x6
LiveCritical
MSC West — Feltham holds 30 free with 44 already inbound, which is 13 days of cover against a forecast of 5.6 a day. Evans Vanodine needs 14 days on the assumed lead time, none is on record and class A carries 7 days of safety stock, so the target position is 117 units. Neither depot has spare cover, so buy 48 from Evans Vanodine.
Do nothing and MSC West — Feltham runs out on 01/09/2026, which is 5 days. Evans Vanodine needs 14 days to deliver. That is about £6,130 of sales at risk on this line alone.
| Step | Why | Units |
|---|---|---|
| Free stock at the depot | 33 on hand less 3 already allocated to orders | 30 |
| Open purchase orders inbound | Counted once, never double counted with the depot holding | 44 |
| Position the engine works from | Free stock plus what is already inbound | 74 |
| Forecast demand a day | Eight weeks ahead, seasonally shaped, one-off months excluded | 5.55 |
| Lead-time demand | 5.55 a day for 14 days from Evans Vanodine, assumed because no lead time is on record | 78 |
| Safety stock, class A | Class A carries 7 days of cover for the variability this line shows | 39 |
| Target position | Lead-time demand plus safety stock | 117 |
| Shortfall | Target position less the position now, which is why this line is on the queue | 43 |
| Rounded to the supplier multiple | Evans Vanodine ships in cases of 6 | 48 |
MSC East — Brentwood holds 184 free and needs all of it for its own cover, so there is nothing to move.
- Order48 units, 8 cases of 6
- ArrivesDay 14, assumed, no lead time on record
- Cost£2,081.28, carriage paid
- Terms60 days net · Structured email
- Supplier record85 per cent on time, 86 per cent in full
- Minimum order£150, met
Products, suppliers, prices and case multiples are MSC's real range. Demand history, lead times and supplier terms are derived for the demo, deterministically, so the figures never move between screens.