DC

BioHygiene All Purpose Sanitiser Fragranced RTU 750ml

LiveCritical
Today: NETSTOCK, hand-keyed into BC
BH008 · Bio HygieneMSC West — FelthamClass B · confidence 86 per cent, high
Replaces: a NETSTOCK spreadsheet row with no working shown
What the engine saysPlain English first, the arithmetic underneath
BioHygiene All Purpose Sanitiser Fragranced RTU 750ml

MSC West — Feltham holds 0 free with 22 already inbound, which is 10 days of cover against a forecast of 2.2 a day. Bio Hygiene needs 3 days and class B carries 10 days of safety stock, so the target position is 29 units. MSC East — Brentwood can release 57 without going short, so move 7 on tomorrow's trunk run and buy nothing.

Do nothing and MSC West — Feltham is already out, so every order for this line goes short until something arrives. That is about 6 units of demand across the lead time. That is about £34 of sales at risk on this line alone.

Runs out27/08/2026Supplier needs3 daysUses a month65Sales at risk£34On the queue7 daysConfidence
Every figure on this page is the one the order will carry. Accepting the line copies none of it by hand.
Cover against lead timeFree stock running down, day by day
Safety stock 22Supplier arrives day 3Out on day 0220todayday 21
The blue line is free stock falling at the forecast rate. The dashed marker is the earliest a supplier delivery could land. Where the line reaches zero first, the depot is short and no amount of ordering on the day it happens will fix it.
Twelve months of demandMSC West — Feltham
AugSepOctNovDecJanFebMarAprMayJunJul
No one-off month found in the last year. Variability is 7 per cent of the mean, which is what sets the confidence on this line.
Eight weeks aheadForecast inside its confidence band
18027 Aug10 Sep24 Sep8 Oct
Bio Hazard runs at 92 per cent of an average month now and 106 per cent next month, which the forecast already carries.
The calculationEvery figure the engine used, in the order it used it
StepWhyUnits
Free stock at the depot7 on hand less 7 already allocated to orders0
Open purchase orders inboundCounted once, never double counted with the depot holding22
Position the engine works fromFree stock plus what is already inbound22
Forecast demand a dayEight weeks ahead, seasonally shaped, one-off months excluded2.16
Lead-time demand2.16 a day for 3 days from Bio Hygiene7
Safety stock, class BClass B carries 10 days of cover for the variability this line shows22
Target positionLead-time demand plus safety stock29
ShortfallTarget position less the position now, which is why this line is on the queue7
Rounded to the supplier multipleBio Hygiene ships in cases of 100
Free stock at the depot
Why7 on hand less 7 already allocated to ordersUnits0
Open purchase orders inbound
WhyCounted once, never double counted with the depot holdingUnits22
Position the engine works from
WhyFree stock plus what is already inboundUnits22
Forecast demand a day
WhyEight weeks ahead, seasonally shaped, one-off months excludedUnits2.16
Lead-time demand
Why2.16 a day for 3 days from Bio HygieneUnits7
Safety stock, class B
WhyClass B carries 10 days of cover for the variability this line showsUnits22
Target position
WhyLead-time demand plus safety stockUnits29
Shortfall
WhyTarget position less the position now, which is why this line is on the queueUnits7
Rounded to the supplier multiple
WhyBio Hygiene ships in cases of 10Units0
Confidence is 86 per cent because demand varies by 7 per cent month to month.
Buy or transferTransfers are weighed before purchases, every time
Transfer from the other depotEngine leads with this
  • Move7 units from MSC East — Brentwood
  • ArrivesNext day, on the trunk run
  • Cost£10.52 of handling, nothing bought
  • Cash held back£22
  • Carbon0.6 kg CO2e avoided
  • Safe to release57 units, after MSC East — Brentwood keeps its own cover
Buy from Bio Hygiene
  • Order0 units, 0 cases of 10
  • ArrivesDay 3
  • Cost£0.00 plus £34.00 carriage, under the £250 threshold
  • Terms60 days net · CSV drop
  • Supplier record79 per cent on time, 96 per cent in full
  • Minimum order£250, met
Fulfil elsewhere and substitute are the other two options in the client's scope. They are named here and not yet built, because a substitution rule needs their own product data to be honest.
Your decisionThe engine recommends, you decide and the reason is kept
Accepting puts these units on PO-4527 for Bio Hygiene at MSC West — Feltham, carrying the figures above. Nothing reaches the supplier until a person sends it.