Jangro Hand & Surface Wipes x80
LivePlanned
MSC East — Brentwood holds 166 free with 2 already inbound, which is 19 days of cover against a forecast of 8.8 a day. PAL needs 14 days on the assumed lead time, none is on record and class A carries 7 days of safety stock, so the target position is 185 units. Neither depot has spare cover, so buy 18 from PAL.
Do nothing and MSC East — Brentwood runs out on 15/09/2026, which is 19 days. PAL needs 14 days to deliver. That is about £622 of sales at risk on this line alone.
| Step | Why | Units |
|---|---|---|
| Free stock at the depot | 171 on hand less 5 already allocated to orders | 166 |
| Open purchase orders inbound | Counted once, never double counted with the depot holding | 2 |
| Position the engine works from | Free stock plus what is already inbound | 168 |
| Forecast demand a day | Eight weeks ahead, seasonally shaped, one-off months excluded | 8.79 |
| Lead-time demand | 8.79 a day for 14 days from PAL, assumed because no lead time is on record | 124 |
| Safety stock, class A | Class A carries 7 days of cover for the variability this line shows | 62 |
| Target position | Lead-time demand plus safety stock | 185 |
| Shortfall | Target position less the position now, which is why this line is on the queue | 17 |
| Rounded to the supplier multiple | PAL ships in cases of 6 | 18 |
MSC West — Feltham holds 134 free and needs all of it for its own cover, so there is nothing to move.
- Order18 units, 3 cases of 6
- ArrivesDay 14, assumed, no lead time on record
- Cost£50.04 plus £22.00 carriage, under the £250 threshold
- Terms60 days net · Supplier portal
- Supplier record87 per cent on time, 92 per cent in full
- Minimum order£250, so this line is combined onto the supplier's order rather than shipped alone
Products, suppliers, prices and case multiples are MSC's real range. Demand history, lead times and supplier terms are derived for the demo, deterministically, so the figures never move between screens.